| Description: |
New construction of an 18,500 seat state-of-the-art professional sports arena to accommodate NBA and NHL events.
This design-assist project included equipment procurement, coordination, and installation. A 1,500KW generator with (9) transfer switches was installed, tested, and commissioned. The project included access control, CCTV, fire alarm and smoke control systems. Conduit and cable tray systems were installed for the sound, audio-visual, TV, and broadcast cabling systems. Parsons Technologies installed the copper and fiber backbone and all horizontal cabling throughout the facility. |