This confidential client's project was a data and processing center.
Parsons completed this project on a negotiated design-assist basis. As an integrated member of the design and construction team, this facility was completed ahead of schedule with significant cost savings realized. As one of the most reliable power system designs available, this 4.5 MVA total back-up power generator plant and 2.25 MVA UPS power with dual critical bus will deliver 24x7 reliability to this mission critical operation. |